Call Us: 216-432-3000

Featured Product

Solar Carports with Electric Vehicle Chargers

Now Offering 4 & 8 Stall Solar Carports

Now Offering 4 & 8 Stall Solar Carports

• Customizable “Green” Marketing Billboard with10KW

  or 20KW solar output.

• 4 stall includes 2 Eaton Level 2 Electric Vehicle

  Chargers and 8 stall includes 3.

• Turn-key project from permitting to commissioning

  utilizing your preferred electrical contractor.

• Clean construction and fast installation time. Only

  four weeks after permits are secured!

• Easily upgradable as technology advances.

• 95% of all materials are American made, including

  the solar panels.

• Great Federal, State and SREC Incentives available.

• Financing options.

  • August 2019 News
    Grand Openings in Portage and Warren/Youngstown; Outdoor Lighting In Stock; Lithonia CPX™ LED Edge-Lit Flat Panel; Eaton Yeti Cooler Raffle; 3M Safety T Promo; August Double Bonus Trip Points Vendors: Lithonia and General Cable.

  • July 2019 News
    Lutron Brown and Orange Shirts and Baker Mayfield Jersey Promotion; Trip double bonus points vendors: Caddy & GE.

  • Warren/Youngstown Grand Opening!

  • Portage Grand Opening!

View News, Events & Training